2023 Guizhou Information Park A10 Data Center Basic Supporting Project, China Telecom; A10 Data Center Production Capacity Supporting Project


Industry:

Communication

Party A Name

China Telecom Co., Ltd. Guizhou Cloud Computing Branch

Project Area

Guiyang City, Guizhou Province

Equipment Status

30 units of 120kw heat pipe host + 704 units of backplane wind wall

Acceptance Date

August 2023

Operating Status

Currently, the equipment is operating well

Project Highlights: In addition to achieving energy saving requirements through the use of a fluorine pump double-cycle energy-saving type computer room air conditioner, this project also incorporates the use of a V-type condenser. The indoor unit uses a 5KW backplane wind wall to fit the IT cabinet, reducing the cold loss of traditional air-cooled air conditioners. The V-type outdoor unit reduces the floor space by about 50%; the energy consumption is below 1.3. Currently, the equipment is operating well, and customer feedback is highly satisfactory.

------WebKitFormBoundaryCBvuQesqAZQBoBnp Content-Disposition: form-data; name="overwrite" 0